To be listed on the CAMPOSOL TODAY MAP please call +34 968 018 268.
Guidelines for submitting articles to Condado Today
Hello, and thank you for choosing CondadoToday.com to publicise your organisation’s info or event.
Condado Today is a website set up by Murcia Today specifically for residents of the urbanisation in Southwest Murcia, providing news and information on what’s happening in the local area, which is the largest English-speaking expat area in the Region of Murcia.
When submitting text to be included on Condado Today, please abide by the following guidelines so we can upload your article as swiftly as possible:
Send an email to editor@condadotoday.com or contact@murciatoday.com
Attach the information in a Word Document or Google Doc
Include all relevant points, including:
Who is the organisation running the event?
Where is it happening?
When?
How much does it cost?
Is it necessary to book beforehand, or can people just show up on the day?
…but try not to exceed 300 words
Also attach a photo to illustrate your article, no more than 100kb
article_detail
Date Published: 09/05/2024
Work begins to repair Campoamor beach road, but will it last?
Orihuela City Council plans to put a wooden walkway beside La Glea beach
Five years after a powerful DANA storm ripped up the roadway beside Campoamor’s La Glea beach on the Orihuela Costa, which has just been awarded a prestigious Blue Flag, diggers have appeared along the shoreline to rip up the asphalt and replace it with another wooded walkway.
But as residents of the area can attest, this has been tried before and heavy rains have simply washed the wooden structures away, leaving the path impassable for both vehicles and pedestrians.
At the moment, the road is completely closed off to traffic, meaning cars have to detour up and around the residential streets, behind the bridge that crosses over the river.
But it’s precisely this river that causes some of the problems, as local groups have been tirelessly arguing, and unless the drainage issues are tackled once and for all, there’s nothing preventing the overflow washing down onto the beach if there’s a storm.
Moments after the work began to tear up the existing road, officers from the Local Police force halted the job due to a longstanding argument between the City Council, who wants the road open to traffic as soon as possible, and Costas, who claim the new structure will hinder the free flow of the Nacimiento River.
In any case, the works resumed on Wednesday May 8 so it looks like the plans for a new wooden walkway are going ahead. It’s unclear how long the job will take, or how long beachgoers will have to endure the noise and disruption.
In the meantime, the Neighbourhood Association of Cabo Roig and Lomas (AVCRL) has demanded answers from the Orihuela City Council about whether they will be responsible for its maintenance and almost inevitable repairs in the future.
In other news: Two earthquakes rock the Orihuela Costa area of Alicante
Images: AVCRL
Loading
Sign up for the Spanish News Today Editors Roundup Weekly Bulletin and get an email with all the week’s news straight to your inbox
Special offer: Subscribe now for 25% off (36.95 euros for 48 Bulletins)
OR
you can sign up to our FREE weekly roundup!
Read some of our recent bulletins:
25% Discount Special Offer subscription:
36.95€ for 48 Editor’s Weekly News Roundup bulletins!
Please CLICK THE BUTTON to subscribe.
(List price 3 months 12 Bulletins)
Read more stories from around Spain:
Contact Murcia Today: Editorial 000 000 000 /
Office 000 000 000